The Sde Dov waterfront: beach and promenade with the former airfield inland, looking south toward Tel AvivPhoto: District records

La dernière côte de Tel-Aviv se vend en ce moment.

1 300 dunams de front de mer cédés lot par lot, et la plupart sont réservés avant même d'être annoncés. Voyez chaque parcelle, chaque permis et chaque prix en premier.

1938L'aérodrome

Sde Dov opened in September 1938, carved out of the dunes north of the Yarkon while the roads to Lydda were unsafe. Palestine Airways flew from here; the RAF took it in the war; Israel's first air force squadron lifted off from this strip in 1947. The city grew up around it and never quite got over it: a working airport on the most valuable coastline in the country.

In its final full year the little field moved 703,649 passengers, most of them shuttling to Eilat. On June 30, 2019, the last flight departed and the tower went quiet. Only that tower still stands today: the one building the plan preserves.

Le hangar principal, photographié l'année où l'aérodrome a ouvert sur les dunes au nord du Yarkon.Zoltan Kluger, Government Press Office · restored and colourised
Approche finale, la tour de contrôle à l'horizon. La plupart de ces vols étaient la navette d'Eilat.Chen Haik / PikiWiki · colour-graded
Un atterrissage de nuit sur le terrain urbain. La mer est juste au-delà des feux de seuil.Oren Peles / PikiWiki (CC BY 2.5) · colour-graded
The control tower from below: the one building from the airfield that the plan preservesPikiWiki Israel / Wikimedia Commons

1970sUn demi-siècle de bras de fer

1,892 owners, one runway.

The land under the runway was never simple. Inside the airport's fence sat "the Big Bloc": famous parcels bought by private families generations ago, 1,892 owners whose rights a court only finished sorting in September 2025. Around them, the state, the city, and the army argued for fifty years about whether planes or people should own this coast.

The government decided in 2012. The Defense Ministry took a billion shekels to leave early, the Supreme Court set the date, and in July 2019 the fence came down. Within a year the runway was rubble and Tel Aviv was staring at something it had never had: an empty, city-sized piece of itself, one row of dunes from the sea.

Octobre 2020 : l'aéroport effacé, le terrain en attente, une rangée de dunes de la mer.Stas Umansky, Wikimedia Commons (CC) · colour-graded
Les hangars vidés. Dernier vol le 30 juin 2019 ; en février, le terrain était déblayé pour le quartier.Times of Israel

2020Un quartier dessiné d'un seul trait

Masterplan TA/4444 has been in force since August 2020, and it is not a housing estate. It is a full district drawn at once, the way planners dream and cities rarely allow. Sixteen thousand homes in three complexes. Half a million square meters of schools and public buildings. Offices, shops, around 3,000 hotel rooms, and almost a third of the ground given to parks.

Towers stand back from the water behind low "fabric" buildings of seven to nine floors, so the street stays human and the skyline steps up as you walk inland. The old runway becomes Runway Park. The Green Line light rail crosses the district with four stations. Even the garbage is planned: pneumatic pipes instead of trucks.

complexes, Eshkol, Central, North
3complexes, Eshkol, Central, North
dunams of public space
~480dunams of public space
light-rail stations on the Green Line
4light-rail stations on the Green Line
hotel rooms planned
3,000hotel rooms planned
sqm of public buildings
500Ksqm of public buildings
floors, low streets to landmark towers
7-45floors, low streets to landmark towers

Sources: Plan TA/4444 program figures, Tel Aviv-Yafo municipality and district-plan documents, via district records.

The masterplan: Eshkol south, Central, and North along two kilometers of coastPlan TA/4444, via district records
Four light-rail stations: Propes, Nofei Yam, Einstein, Zahara LevitovNTA

2021La terre la plus chère d'Israël

When the state finally auctioned the first lots in 2021, developers paid ₪4.4 billion for the right to build 1,540 homes: about ₪2.8 million per apartment before a shovel touched the ground, six and a half times the minimum price. Then came the biggest residential tender wave in Tel Aviv's history: land for more than 7,100 homes offered in one push in September 2024.

The 2025 winners paid roughly forty percent less per home than the 2021 record: a rare, honest repricing of the country's most wanted address. Israel Canada, Gindi, Dimri, Hagag, Dan, Melisron, Tshuva: nearly every major name in Israeli real estate now holds a piece of the field.

2021
₪4.4B
first tender: 1,540 homes, 6.5× the minimum price
2022
₪654M
follow-up tender cools: 241 homes
2024
7,159
homes offered in one mega-tender wave
2025
−40%
land price per home vs. the 2021 record

Sources: Israel Land Authority tender results via Globes, Ynet, Nadlan Center.

NOWÇa s'élève maintenant

The first cornerstone was laid in November 2024, and the southern complex is now a forest of cranes. Rainbow's tower is climbing under Ashtrom's cranes. ASHIRA holds a full building permit. UTOPIA broke ground in October 2025. Sales run hot and cold (a ₪19.5 million penthouse here, a pricing war there), and in February 2026 the site delivered its hardest news yet: PFAS contamination in the groundwater, a legacy of decades of firefighting foam, now under a state-run cleanup fast track.

We tell that part too. This site is not selling you a render; it is tracking a district being born, permit by permit, with sources on every number. First residents are expected around 2029. The last crane leaves sometime after 2035.

The Eshkol complex under construction, January 2026Photo: District recordsPhoto: Stas Umansky / Wikimedia Commons, modified
Vue aérienne du site démoli de l'aéroport Sde Dov, octobre 2020
2020: cleared2026: rising
2020: cleared2026: rising
Faites glisser le curseur : le même sol, six ans d'écartStas Umansky, Wikimedia Commons (CC) · colour-graded · District records
Streets first: Eshkol infrastructure worksDistrict records
Eshkol's first towers out of the groundDistrict records

MAINTENANT9 projets sont déjà sur le terrain.

Ceux sur lesquels vous pouvez vraiment enquérir, avec une source sur chaque chiffre.

Tous les projets et lots

AUJOURD'HUIAu fil de l'actualité.

La presse hébraïque, sourcée, en français, quand quelque chose bouge vraiment sur le terrain.

Toutes les actualités
12 nov. 2026
Des propriétaires de terrains au nord de Sde Dov exigent plus de droits à bâtir, en citant Sde Dov

Rova Sde Dov : des promoteurs et des détenteurs de droits du nord-ouest de la ville exigent plus de droits à bâtir, en citant Sde Dov, lors de l'audience du 4 novembre sur les oppositions au nouveau plan directeur de Tel Aviv-Jaffa (TA/5500). Huit oppositions ont été déposées sur le plan 3700 (environ 1 900 dunams, environ 12 000 logements prévus), dont six demandent plus de construction, plus de hauteur ou la réouverture du plan ; Shikun & Binui Nadlan a demandé un coefficient d'emprise (FAR) maximal de 14 dans les blocs 3 et 4. L'équipe de planification nord de la municipalité recommande de rejeter la réouverture générale, mais soutient la refonte du bloc sud 3700/1 avec des tours pouvant atteindre 45 étages.

Urbanismevia Rova Sde Dov
8 nov. 2026
L'Autorité foncière d'Israël informe le tribunal de dépassements de pollution sur un lot du Gush HaGadol

Globes : l'Autorité foncière d'Israël a indiqué au tribunal d'instance de Herzliya que les résultats obtenus jusqu'ici pour quatre lots privés du Gush HaGadol montrent un dépassement des seuils de contact direct avec le sol sur le lot 2210. Aucun dépassement n'a été relevé sur les lots 2204, 2214 et 2202. Les polluants sont des composés PFAS, et le tribunal a ordonné une nouvelle mise à jour au plus tard le 7 décembre 2026.

Environnementvia Globes
3 nov. 2026
Quatre promoteurs de Sde Dov garderont 2 514 logements en location pendant au moins 20 ans

Rova Sde Dov : Shikun & Binui, Prashkovsky, Union Liv et Africa Israel ne vendront pas les logements de leurs projets locatifs à Sde Dov, mais les loueront et les géreront pendant au moins 20 ans. Ensemble, elles détiendront 2 514 logements construits dans le cadre d'appels d'offres de la société publique Dira Lehaskir, dont la moitié sera louée à des ayants droit à prix réglementé et l'autre moitié aux prix du marché. Yossi Prashkovsky, président de Prashkovsky, indique que l'entreprise a payé environ 600 000 ₪ de terrain par logement. Après 20 ans, les sociétés pourront vendre les logements, et Prashkovsky dit voir une vente au bout du chemin.

Marchévia Rova Sde Dov

2029La trajectoire atterrit au terminal.

La carte, chaque parcelle, chaque vente enregistrée, chaque permis, les preuves derrière cette page, avec une source sur chaque chiffre.

Ouvrir le Terminal
ARRIVÉES
SDV · TLV
  • 2029Premiers habitantsPrévu
  • —Parcelles cadastrales cartographiées—
  • —Ventes enregistrées—
  • —Chantiers suivis—

Un projet précis vous intéresse ?

Dites-nous lequel, et ce que vous cherchez. Nous sommes un guide indépendant du quartier, et nous répondons par e-mail sauf si vous demandez autrement.

Guides acheteur