Skip to content
Shavnu

The 2027 calendar

Sde Dov in 2027: what changes, and what to watch

The decisions, deadlines and milestones from late 2026 to early 2028 that change what a home in Sde Dov costs or when it can be lived in. Each date carries its source and says whether it is set by law, announced, expected or only possible. Nothing here is a forecast of prices.

Checked 6 October 2026. This page is in English.

  • scheduled by law
  • announced
  • expected
  • possible

Q4 2026

  1. 21 Oct 2026financeannounced

    Next scheduled Bank of Israel rate decision

    The 1 September statement schedules the next decision for 21 October. The policy rate stood at 3.25%; the calendar does not predetermine a cut or a buyer's mortgage quote.

    Bank of Israel: 1 September 2026 monetary-policy decision and next meeting

  2. 27 Oct 2026politicsscheduled by law

    Statutory date for the 26th Knesset election

    The Central Elections Committee gives 27 October 2026 as the statutory date if the outgoing Knesset completes its term. The government formed afterwards will determine budget and housing-policy priorities; no fixed 2027 election is assumed.

    Central Elections Committee: statutory date of the 26th Knesset election

  3. 31 Dec 2026taxscheduled by law

    Written end date of the additional-home purchase-tax order

    Instruction 1/2026 gives this end date for the temporary 8% and 10% additional-home rates. Election-related statutory continuity and further legislation can affect expiry, so a lower rate on 1 January 2027 is not established.

    Israel Tax Authority: real-estate taxation instruction 1/2026, expiry and frozen thresholds; Gelberg Law: additional-apartment purchase tax in 2027 and Basic Law section 38

  4. 31 Dec 2026financeannounced

    Published end of the temporary developer-finance restrictions

    The Bank of Israel's 2024 Banking System Annual Survey says the April 2025 temporary directive remains in effect through the end of 2026. A 2027 extension or replacement must be checked; expiry alone does not ensure that a bank or developer offers a particular payment plan.

    Bank of Israel: Banking System Annual Survey 2024, Box 5.2, developer-subsidized balloon loans

Q1 2027

  1. Q1 2027taxpossible

    Possible election-related continuation of the tax order

    Section 38 of Basic Law: The Knesset can keep expiring legislation in force through the incoming Knesset's first three months. The quarter is a review window, not a confirmed tax-change date; the first sitting and applicable legislation need verification.

    Gelberg Law: interaction between the additional-home tax order and section 38

  2. Q1 2027constructionannounced

    Luzon Ronson Central land handover target

    Deep TASE's 21 May 2026 analysis of the company's Q1 report describes land delivery under the development agreement in Q1 2027. This is a land milestone; apartment handover and unconditional sales require separate evidence.

    Deep TASE: analysis of Luzon Ronson Q1 2026, Central land delivery and conditional contracts

Q2 2027

  1. 17 Jun 2027financeannounced

    Reported maturity of Luzon Ronson Central's land loan

    Deep TASE's analysis of the 2025 annual report states that a NIS 585.6 million land loan matures on 17 June 2027. The original filing and any subsequent refinancing should be checked; a reported maturity does not establish a funding shortfall.

    Deep TASE: analysis of Luzon Ronson 2025 annual report, Central land-loan maturity

  2. Q2 2027financeexpected

    Quarter covered by the Bank of Israel's 3.0% rate forecast

    The Research Department's 6 July 2026 forecast puts the average policy rate in Q2 2027 at 3.0%. This is a conditional forecast, dependent on security and fiscal assumptions, and does not schedule a specific rate cut.

    Bank of Israel Research Department: July 2026 staff forecast, Q2 2027 average policy rate

Q4 2027

  1. Q4 2027infrastructureexpected

    Levi Eshkol walking and cycling bridge target

    Works on the bridge over Rokach Boulevard began on 19 July 2026, and the municipality estimates about 15 months of construction, which puts completion around autumn 2027. It links the Eshkol area towards Yarkon Park for people on foot and on bicycles; a separate future crossing of the river has no confirmed opening date.

    TLV Online: works begin on the Levi Eshkol bridge over Rokach Boulevard, about 15 months

Q1 2028

  1. 15 Jan 2028taxscheduled by law

    End of the published purchase-tax threshold freeze

    Tax Authority instruction 1/2026 fixes the relevant sole-home and immigrant thresholds through 15 January 2028. It does not publish the thresholds that will apply afterwards, and the additional-home temporary order has a separate timeline.

    Israel Tax Authority: real-estate taxation instruction 1/2026, expiry and frozen thresholds

2028, date not fixed

  1. 2028infrastructureannounced

    Green Line: southern section due, Sde Dov section targeted for 2030

    The Ministry of Transport's published programme targets operation of the southern part of the Green Line in 2028 and completion of the northern section that serves Sde Dov in 2030. Nothing in the programme puts a light rail service through the district in 2027.

    Ministry of Transport: phased Green Line operation, southern section in 2028 and full line in 2030

Questions about 2027

When does the 8% and 10% purchase tax on additional homes end?
Instruction 1/2026 gives this end date for the temporary 8% and 10% additional-home rates. Election-related statutory continuity and further legislation can affect expiry, so a lower rate on 1 January 2027 is not established. Section 38 of Basic Law: The Knesset can keep expiring legislation in force through the incoming Knesset's first three months. The quarter is a review window, not a confirmed tax-change date; the first sitting and applicable legislation need verification.
Will mortgage rates in Israel fall in 2027?
The 1 September statement schedules the next decision for 21 October. The policy rate stood at 3.25%; the calendar does not predetermine a cut or a buyer's mortgage quote. The Research Department's 6 July 2026 forecast puts the average policy rate in Q2 2027 at 3.0%. This is a conditional forecast, dependent on security and fiscal assumptions, and does not schedule a specific rate cut.
Do the limits on 20/80 and developer-funded deals continue in 2027?
The Bank of Israel's 2024 Banking System Annual Survey says the April 2025 temporary directive remains in effect through the end of 2026. A 2027 extension or replacement must be checked; expiry alone does not ensure that a bank or developer offers a particular payment plan.
When will the Green Line light rail reach Sde Dov?
The Ministry of Transport's published programme targets operation of the southern part of the Green Line in 2028 and completion of the northern section that serves Sde Dov in 2030. Nothing in the programme puts a light rail service through the district in 2027.
Can anyone move into Sde Dov in 2027?
No home in the district has been handed over yet. The earliest published delivery target is 2029, for UTOPIA (about 40 months from October 2025).
Until when are the purchase tax thresholds frozen?
Tax Authority instruction 1/2026 fixes the relevant sole-home and immigrant thresholds through 15 January 2028. It does not publish the thresholds that will apply afterwards, and the additional-home temporary order has a separate timeline.

Work out your own numbers with the purchase tax calculator and the mortgage and cash calculator, which use the rules in force today.

Your privacy choices. Privacy policy