A Third of the Ground Is Green: The Parks, the Promenade, and Two Kilometers of Beach
Plan TA/4444 locks about 365 dunams of parks and two kilometres of public shore on the old airfield. Here is what you can already walk, what is still a drawing, and how the lawns are supposed to be watered.

The arithmetic of unbuilt ground
The district’s own story line likes a round number: almost a third of the ground given to parks. The statutory file is colder. Plan TA/4444, validated in March 2020, programmes about 365 dunams of parks on a field of about 1,500 dunams. A dunam (דונם) is 1,000 square metres. Three hundred and sixty-five divided by 1,500 is about a quarter of the dirt, not a third.
The rest of the green claim is the public edge. Two kilometres of beach stay public. Park HaChof (פארק החוף, Coastal Park) alone is listed at about 240 to 265 dunams along that shore, the largest single open space in the plan. A Linear Park is meant to stitch the three mitcham (מתחם, complexes) together. Park HaMaslul (פארק המסלול, Runway Park) keeps the line of the old strip. Add the hatzer be’zikat hana’a (חצר בזיקת הנאה, easement courtyards) inside the blocks, and the street trees a September 2025 magazine piece said would grow “exceptionally tall,” and the unbuilt programme is the argument against a wall of towers.
TA/4444 is a housing plan first: about 16,000 homes, including about 6,900 units of diur mechalil (דיור מכליל, inclusive housing). It is also a parks plan. First occupancy is targeted around 2029, with full build-out toward about 2035. The promenade is already there. Most of the lawns are not.
| Element | Figure | Record |
|---|---|---|
| District area | ~1,500 dunams | TA/4444 / about page |
| Parks in the validated plan | ~365 dunams | TA/4444, March 2020 |
| Coastal Park (Park HaChof) | ~240-265 dunams along 2 km of shore | Glossary; Feb 2025 news cites 240 |
| Public beach | 2 km | TA/4444 |
| Promenade opening | September 2023 | sdedov.co.il, 13 Sep 2023 |
| Karavan Prize (promenade) | 2025 | sdedov.co.il, 11 Sep 2025 |
| Greywater (Eshkol) | 2,000 apartments | Magazine, 8 Jan 2025 |
| Tel Baruch barbecue ban | From 1 Jan 2026 | sdedov.co.il, 28 Dec 2025 |
| Eshkol-Yarkon Park bridge | Construction started | sdedov.co.il, 5 Aug 2026 |
Plan totals: sdedov.co.il about page and district glossary. Event dates: news and magazine archive.
Coastal Park and the promenade you can walk today
On 3 February 2019, with aircraft still using the runway, the coastal committee approved masterplan elements that included two parks to connect future residents to the beach. The field was still an airport. The maps were already a neighbourhood. Plan validation followed in March 2020. The first large piece of that coastal programme to exist in asphalt, not only in a rendering, is the tayelet (טיילת, promenade) of Park HaChof.
sdedov.co.il dated the opening 13 September 2023 under a headline that ran the path from Herzliya to Bat Yam. The Sde Dov stretch is the new middle: two kilometres of public shore where the fence used to be. In February 2025 the same site listed three parks advancing together and put Coastal at 240 dunams. The glossary range is 240 to 265. Both figures describe one park.
On 11 September 2025 the promenade won the Karavan Prize for landscape architecture. The corpus records the prize and the date, not the jury. In January 2024 the same archive reported an environmental visitor centre to be built inside Coastal Park. That building is a plan item. It is not, on this record, an open door.

Promenade opening: 13 Sep 2023. Karavan Prize: 11 Sep 2025. Visitor centre: 5 Jan 2024. Coastal 240 dunams: 6 Feb 2025. Range 240-265: district glossary.
Two kilometres of public beach, and a barbecue ban
A June 2024 magazine feature called the two-kilometre beachfront the district’s most valuable resource. That is editorial language, and it is also the plan’s hard line. About 3,000 hotel rooms are programmed across 16 lots, eight of them on the beachfront. The hotels sit along a public shore. They do not privatise it. TA/4444 keeps the coastal edge open even as private towers rise behind fabric buildings of seven to nine floors.
The north end of that shore is Hof Tel Baruch (חוף תל ברוך, Tel Baruch beach). Photographs from January 2026 show a working city beach: surfers, a breakwater, ordinary sand. On 28 December 2025 the city announced a barbecue ban there from 1 January 2026, under the headline “clean air at Tel Baruch.” The corpus records the ban and the date, not the fines or hours. A buyer who wants a mangal (מנגל, barbecue) on the sand should assume Tel Baruch no longer allows it.
The beach is the one open-space asset that does not wait for 2029. You can walk it now. What you cannot do is treat the sand as a private garden for the tower behind it. The plan’s coastal rule and the city’s barbecue rule point the same way: this shore is public, and it is regulated as such.

Two kilometres as the district’s most valuable resource: magazine, 30 Jun 2024. Hotel lots: catalog and lots registry. Barbecue ban: 28 Dec 2025.
Runway Park and the tower demolition left standing
When runway demolition began on 31 July 2019, one structure was kept as a historic building: the control tower. The site was fully vacated by early 2020. It is the only airport object the plan intends to keep in place.
Park HaMaslul takes the alignment of the old strip and puts the tower at the centre of the new neighbourhood. A 30 January 2024 feature put both objects in the headline: past and future, Runway Park and the control tower at the heart of the neighbourhood. The February 2025 parks article listed Runway Park with Coastal and Linear as the three parks then advancing. The corpus does not give Runway Park its own dunam figure. What is sourced is the geometry: the park follows the runway, and the tower stays.
That geometry is also a contamination geometry. PFAS compounds from firefighting foam were disclosed in the old airport’s soil and groundwater in February 2026. Foam used on a runway does not stay on the runway. Runway Park and Coastal Park occupy the same former field that produced those findings, a ministry halt demand on infrastructure works in July 2026, and the first buyer lawsuit that August. Open space is not a cleanup certificate. A park drawn on a contaminated lot is still a contaminated lot until a lot-level file says otherwise.
Tower preserved: timeline, 31 Jul 2019. Runway Park feature: 30 Jan 2024. PFAS: Feb 2026 news wave; halt demand 19 Jul 2026.
The Linear Park, two bridges, and the south edge
The Linear Park is the connector. February 2025 coverage grouped it with Coastal and Runway as the three parks moving together. A resident should be able to move between Eshkol, Central, and North without treating Ibn Gvirol as a wall. A December 2024 article described a new boulevard giving Lamed-neighbourhood residents a way to the sea. The Linear Park is the in-district version of that impulse.
Two pedestrian bridges sit next to that network and are easy to confuse. The Einstein pedestrian and bicycle bridge, linking New Lamed with Nofei Yam, opened on 27 November 2023 after its western span was lifted in May. That link already exists. The Eshkol-Yarkon Park bridge is a different structure. Construction on the span joining Mitcham Eshkol (מתחם אשכול, the southern complex) to Yarkon Park began on 5 August 2026. A third crossing, the light-rail Yarkon bridge, is a 2024 transit work, not a park path.
South of Eshkol the field meets Reading (רדינג), the 1938 power station that opened the same year as the airfield. Generation was announced to stop in January 2024. Reading Park, covered in an August 2023 magazine piece as a place for a picnic, a run, a seat by the lighthouse, or a sunset, already occupies the tanks’ edge. A leisure marina of about 300 moorings (Ma’aganat Reading, מעגנת רדינג) was approved in April 2024. That south edge sits outside TA/4444’s 365 dunams. It is the landscape the new bridge is being built to reach.

Linear Park: 6 Feb 2025. Einstein bridge: 27 Nov 2023. Eshkol-Yarkon bridge: 5 Aug 2026. Reading Park: 30 Aug 2023. Marina: 2 Apr 2024.
Shower water for the lawns, pipes for the rubbish
Parks on sand need water. A January 2025 magazine feature said 2,000 apartments in Eshkol would join a greywater recycling system, under the headline “from the shower to the neighbourhood park.” The corpus does not name the treatment plant, the litres per day, or which Eshkol migrashim (מגרשים, numbered lots) sit on the loop. Two thousand Eshkol homes, shower water, neighbourhood park: that is the whole claim.
Rain is a separate file. A 30 April 2026 magazine piece described how rainwater will be managed from roof to sea, including blue roofs and runoff. Read it as drainage, not as extra irrigation. In January 2024 a green-building feature described buildings that generate electricity and automated waste removal. The waste half of that promise became a committee decision on 3 July 2025: a pneumatic waste terminal, headlined “no bins, no trucks.” Waste moves through underground pipes to a central facility. Sixteen thousand homes are not supposed to mean a daily fleet of garbage trucks on the new streets.
The parks sit inside that utility grid. A lawn that depends on greywater and a path that depends on a pneumatic terminal are one system. The fifth Tel Aviv water line received a green light on 16 August 2026, framed as paving the way to occupying the district. Occupancy water and park water are not the same pipe. Both have to exist before 2029 feels like a neighbourhood.
Greywater: 8 Jan 2025. Rainwater: 30 Apr 2026. Pneumatic terminal: 3 Jul 2025. Green building: 8 Jan 2024. Fifth water line: 16 Aug 2026.
Luxury without walls, and trees meant to grow tall
The plan’s social idea matches its skyline rule. Planners call it yokra bli chomot (יוקרה בלי חומות, luxury without walls). Blocks use easement courtyards: gardens owned with the buildings but crossed by public rights. A resident keeps a courtyard as part of the home. A pedestrian can walk through the block without hitting a fence. sdedov.co.il covered that internal network on 24 March 2026 as a defining design feature. You are not buying a wall. You are buying a garden the public may cross.
The same logic governs the street. Fabric buildings of seven to nine floors line the blocks; towers of 20 to 45 floors sit behind them. Walk the promenade and the first wall you meet is supposed to be human-scale housing, not a 40-story glass cliff. A 29 September 2025 magazine piece said the trees were also expected to be exceptionally tall. That is the entire sourced claim: no species list, no height in metres. Treat “exceptionally tall” as a planning intention, not as a mature canopy you can photograph in 2026.
An August 2024 magazine headline put 50 consultants and 50,000 residents behind the scenes of planning the district. Fifty thousand is a planning population, not a census. It tells you the parks, the pneumatic pipes, and the easement paths are sized for a small city, not for a cluster of towers with a private lawn.
You are not buying a wall. You are buying a garden the public may cross.
Easement courtyards: 24 Mar 2026. Street trees: 29 Sep 2025. Fifty thousand residents: magazine, 22 Aug 2024.
What you can walk in 2026, and what you cannot
Start from the sand. The two-kilometre public beach is open. Tel Baruch is a working beach with a barbecue ban in force since 1 January 2026. The Coastal Park promenade has been open since September 2023 and carries a 2025 landscape prize. The Einstein pedestrian bridge has been open since November 2023. Reading Park, south of the plan line, is already a picnic ground at the tanks.
Then look inland. Runway Park is an alignment and a preserved tower, not a finished lawn. The Linear Park is a connector on a map. The Eshkol-Yarkon bridge was a construction start in August 2026, not a crossing. The visitor centre is a January 2024 announcement. Greywater for 2,000 Eshkol apartments is a system described in 2025, not a tap you can test from a sales office. The pneumatic terminal is an approved facility. Street trees are a headline about future height.
A serious buyer walks the promenade and then reads the lot file. PFAS findings, a ministry halt demand, and a sales slowdown in the 2026 filings sit on the same field as the Karavan Prize. First keys are still aimed at around 2029. The green third in the title is a claim about how the ground is allocated. The walkable part today is the beach, the promenade, and the paths already around them. Everything else is a plan with a date on it.
Occupancy target: district story and catalog. Sales slowdown: Globes, 2 Jun 2026. Prize and ban dates as above.
Sources
- sdedov.co.il: About the district (plan data)1
- sdedov.co.il: Three parks advance (Feb 2025)2
- sdedov.co.il: Coastal Park promenade opens (Sep 2023)3
- sdedov.co.il: Promenade wins the Karavan Prize (Sep 2025)4
- sdedov.co.il: Runway Park and the control tower (Jan 2024)5
- sdedov.co.il: Eshkol-Yarkon Park bridge (Aug 2026)6
- sdedov.co.il: Tel Baruch barbecue ban (Dec 2025)7
- sdedov.co.il: Greywater for 2,000 Eshkol apartments (Jan 2025)8
- sdedov.co.il: Pneumatic waste terminal approved (Jul 2025)9
- sdedov.co.il: Luxury without walls (Mar 2026)10
- sdedov.co.il: Street trees (Sep 2025)11
- sdedov.co.il: Two kilometres of beachfront (Jun 2024)12
Questions about buying here?
We are an independent guide, not a broker. Tell us what you are looking at and we will answer with sources.