Ashtrom Group is a TASE-listed construction, property and building-industries group founded in 1963. It holds no Sde Dov land: it is the main contractor building Israel Canada's RAINBOW, a 40-storey tower and six 8-storey buildings with about 459 homes, under a contract of about ₪736M signed in December 2025 and reported on 1 January 2026. Works began in January 2026, with the last phase due about four and a half years later; no other Sde Dov contract was found.

The company

Legal name
Ashtrom Group Ltd קבוצת אשטרום בע"מ
Founded
1963, by five founders
Head office
Israel
Listed
TASE: ASHG
Ownership
Public, in the TA-90 index. S&P Maalot affirmed its rating with a stable outlook in April 2026. Chairman Avraham (Rami) Nussbaum, CEO Gil Giron. The Sde Dov works are carried out by Ashtrom Engineering and Construction, a subsidiary of Ashtrom Contracting.
Scale
For 2025: revenue about ₪4.65B, net profit about ₪287M (about ₪270M attributable to shareholders), EBITDA about ₪671M, order backlog about ₪9.5B, and a ₪100M dividend (results published March 2026). In 2026 it moved to losses: about ₪40M in the first quarter and ₪78M in the second, on net finance costs of ₪223M in the second quarter; equity attributable to shareholders was about ₪5.1B at 30 June 2026. Around 120,000 residential units and 3.5M sqm of commercial space built historically (company-stated).
Elsewhere
  • Eight divisions: contracting and infrastructure, residential development, rental housing, income property in Israel, Germany and England, building industries, renewable energy, concessions and international work
  • Shikun HaRofim, next to Sheba Medical Center: 1,189 homes for rent and sale, about ₪2.2B, won December 2025, due 2031 to 2032
  • Rental housing: fifth project completed at Neve Ayalon in early 2026; about 3,280 rental homes planned once Shikun HaRofim is complete
  • RISHO, Ha'Elef complex, Rishon LeZion: five office buildings with the Phoenix group (Ashtrom Properties)
  • Renewable energy in Texas, including EL PATRIMONIO, about 195 MWdc (from 2025)
  • Completed: Da Vinci Towers in Tel Aviv, Beresheet Hotel in Mitzpe Ramon, LYFE Towers in Bnei Brak, the New Haifa Bay Port (company site)
Not to be confused with
Ashtrom holds no land at Sde Dov. Its role here is as a contractor, building RAINBOW for Israel Canada. It is also not the district's infrastructure contractor, which is Galnor.

Timeline

On the record

Published facts a buyer would want before signing. Each carries its source.

Net losses in the first half of 2026

After a 2025 net profit of about ₪287M, Ashtrom reported a net loss of about ₪40M in the first quarter of 2026, mainly from a negative revaluation in rental housing, and a net loss of ₪78M in the second quarter, mainly from ₪223M of net finance costs. Its order backlog stood at about ₪9.5B and Maalot kept a stable outlook in April 2026. Buyers in RAINBOW contract with Israel Canada, not with Ashtrom.