Heter chafira ve'dipun

היתר חפירה ודיפון

An excavation-and-shoring permit for early works, before the full building permit.

This early-works permit lets the contractor dig the basement and shore the pit. Rainbow's March 2024 excavation permit was the first in the district; ASHIRA received its excavation-and-shoring permit in July 2024. It is not permission to build the tower.